Category Archives: Flagship Projects

dubai

DUBAI FESTIVAL CITY

Project Description:
Dubai Festival City (DFC) is located in adjacent to the Creek in East Dubai and has been designed to provide range business environments that offer enterprises unrivalled convenience within the context of a fully integrated community. The hotel development project, a city landmark, forms part of this community and comprises of a 42 storey Commercial Building, a 36 storey Intercontinental Hotel with 498 exquisitely designed rooms including 124 exclusive suites, and a 22 storey Crown Plaza Hotel with 316 rooms and convention centre, all complete with associated facilities and a 3 storey underground car parking for vehicles.

The MEP services installed include engineering, supply, installation, testing and commissioning of HVAC, Fire Fighting, Power, Lighting and all Specialist systems.

Client: Dubai Festival City
Main Contractor: Al-Futtaim Carillion LLC
Consultant: Waterman Emirates
Location: Dubai, UAE
Completion Date: 2008

JBR

JUMEIRAH BEACH RESIDENCE SECTOR 1

Project Description:
JBR Development comprises of 7 Sectors (36 Residential Towers), 4 Hotel Towers and beach clubs, all located across a length of 1.7 kilometers on the Al Sufouh Beach area, adjacent to Dubai Marina. Sector 1 consists of 6 Towers of 1,224 apartments, ranging from Studios to Penthouses positioned on a common Podium area of three level car parking and storage/services facilities. Total Built up area is approximately 180,000 m2.

The MEP services installed include detailed engineering, supply, installation, testing and commissioning of HVAC, plumbing & Drainage, Fire Fighting, Power, Lighting and all Specialist systems.

Client: Dubai Technology and Media Free Zone Authority
Main Contractor: Arab Technical Construction Company (ARABTEC)
Consultant: Hyder International
Location: Dubai, UAE
Completion Date: 2007

salwa

SALWA HOUSING

Project Description:
This project composes of 727 housing units with an overall floor areas of 160,000m², complete with administration facility, sports complex, school, clinic, supermarket, office, clubhouses and restaurants with an overall floor areas of 35,000m² and all necessary infrastructure within a self-contained and secure environment to accommodate approximately 2,500 persons and their families. The project was developed over an area of 1,056,000m².

Client: BAE
Main Contractor: J&P (Overseas) Ltd
Consultant: BAE Systems
Location: Riyadh, KSA
Completion Date: 2006